Send Message
TORICH INTERNATIONAL LIMITED 86-574-88255925 admin@steel-tubes.com
Seamless Automotive Steel Pipe Cold Drawn For Axle Shaft Sleeve YB / T5035 - 1993

Seamless Automotive Steel Pipe Cold Drawn For Axle Shaft Sleeve YB / T5035 - 1993

  • High Light

    drawn over mandrel tubing

    ,

    bearing steel tube

  • Standard2
    DIN EN 10305
  • Grade Group
    10#-45#
  • Thickness
    7 - 26 Mm
  • Outer Diameter(Round)
    70 - 122 Mm
  • Application
    Axle Tubes/ Axle Housing Tubes
  • Technique
    Cold Drawn
  • Product Name
    Automotive Steel Tube
  • OD
    70-122mm
  • Length
    3-11.8m
  • Place of Origin
    Zhejiang, China (Mainland)
  • Certification
    ISO9001, ISO14001, TS16949
  • Minimum Order Quantity
    negotiable
  • Price
    negotiable

Seamless Automotive Steel Pipe Cold Drawn For Axle Shaft Sleeve YB / T5035 - 1993

 
Seamless Steel Automotive Steel Tubes For Axle Shaft Sleeve YB / T5035-1993

 

YB/T5035-1993 Seamless Steel Tube for Axle Shaft Sleeve 45 45Mn2 40Cr 20CrNi3A

 

Axle tubes/ Axle Housing Tubes


Seamless steel tubes for automotive axle housing as per standard YB-T5035
 

Characteristic: long length and cutting length (custom for you)
Various material for your specified end use
Tubes with different heat treatment to have excellent mechanical properties according to customers’ requests.
Available sizes: OD : 78 77 77.5 80 92 95 96 102 108 114 115 116 120 121 122 

                             WT : 7 10 11.5 12 13 15 16 20 20.5 26

Detail available sizes:

Seamless Automotive Steel Pipe Cold Drawn For Axle Shaft Sleeve YB / T5035 - 1993 0

 

If customer advise the OD and WT will follow below tolerance.
Tolerance for OD ±1%
Wall thickness ≤7mm -9,+15%
>7-15mm -10,+12.5%
>15mm -7.5 ,+12.5%
 

If customer advise the OD ID and WT will follow below tolerance.
OD ±1.0%
ID ±1.75%
WT ≤15%


OD 77mm 57mm 10mm
OD +1.0 -0.5mm
ID +1.5 -0.5mm
WT ≤15%
 

Bending:
WT≤15mm >>>1.5mm/m
WT>15mm>>>3.0mm/m

 

Chinese Grade :45 45Mn2 40Cr 20CrNi3A

 

Seamless Automotive Steel Pipe Cold Drawn For Axle Shaft Sleeve YB / T5035 - 1993 1
Seamless Automotive Steel Pipe Cold Drawn For Axle Shaft Sleeve YB / T5035 - 1993 2

About us

1, A professional steel pipes materials inventor, manufacturer and solution provider

Equipment & technology

2, Our technicians are of great engineering experience in steel pipe industry for more than 20 years

Service

3, Stable product quality , supply, the good faith management

Our Service
 

High quality

Standard:ISO9001-2008
Number:02112Q119491R2M
Issue Date:2012-12-12
Expiry Date:2015-12-11
Scope/Range:Manufacture and After-Sales Service of Seamless Steel Tube
Issued By:IAF

High quality

Standard:ISO14001-2008
Number:02112E10591R2M
Issue Date:2012-12-12
Expiry Date:2015-12-11
Scope/Range:Manufacture and Related Management Activities of Seamless Steel Tube
Issued By:IAF

High quality

Standard:TS16949
Number:0200393
Issue Date:2015-01-07
Expiry Date:2018-01-06
Scope/Range:Cold Drawn Seamless Steel Tubes
Issued By:IATF

 
Packing & Delivery

Packing Details  : In bundles in wooden box of automotive steel tube

Delivery Details  : 6-8 weeks

Seamless Automotive Steel Pipe Cold Drawn For Axle Shaft Sleeve YB / T5035 - 1993 3
 

In hexagonal bundles packaging with woven 

In hexagonal shaps,the tubes will be well fixed,so it can avoid the damages when delievey .
 

In wooden boxes.

Solid packaging ,protecting tubes from damages much better.
 
In poywooden packaging,It cut the packaging costs also it can protect tubes well
 
In bundles with end caps.well protect tubes from rust.
 
Carton Packing suit for the cutting length
 
Application

 

 
 
Used for auto industry

 

Seamless Automotive Steel Pipe Cold Drawn For Axle Shaft Sleeve YB / T5035 - 1993 4
Seamless Automotive Steel Pipe Cold Drawn For Axle Shaft Sleeve YB / T5035 - 1993 5

 

 

Used for flying head machine

 

Seamless Automotive Steel Pipe Cold Drawn For Axle Shaft Sleeve YB / T5035 - 1993 6
FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time ?

A: It is according to quantity. And usually is 35-50 days after receiving 30% T/T in advance.

Q: How to get the sample of automotive steel tube ?

A: 

1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.

Q: What is your terms of payment ?

A: 

1.T/T: 30% deposit in advance, the balance 70% paid before shipment

2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation