Haiyan Sanxin Steel Tube Co., Ltd.

 

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Home ProductsHeat Exchanger Steel Tube

boiler seamless steel pipe A210 A1 A179 A192

boiler seamless steel pipe A210 A1 A179 A192

boiler seamless steel pipe A210 A1 A179 A192
boiler seamless steel pipe A210 A1 A179 A192

Large Image :  boiler seamless steel pipe A210 A1 A179 A192 Get Best Price

Product Details:

Place of Origin: Zhejiang, China (Mainland)
Certification: ISO 9001 ISO14001 TS16949

Payment & Shipping Terms:

Minimum Order Quantity: negotiable
Price: negotiable
Detailed Product Description
Standard: ASTM, SA192 Grade: A192
Thickness: 2.2 - 25.4 Mm Section Shape: Round
Outer Diameter(Round): 12.7 - 177.8 Mm Application: Boiler Pipe
Technique: Cold Drawn Product Name: Boiler Seamless Steel Pipe A210 A1 A179 A192
Keywords: Boiler Seamless Steel Pipe Length: 1-12m
End Protector: Plain Surface: Gray
MTC: EN10204.3.2B
High Light:

erw boiler tubes

,

seamless boiler tube

seamless boiler steel tube

 

boiler seamless steel pipe A210 A1 A179 A192

 

Applications:
for Boilers,Superheaters,
Heat-Exchangers,
High-pressure Boilers,
Steam Boilers
Cold Condensers and High-Pressure Services,
High-Temperature Services for Boiler Constructions
Manufacture:Tubes are manufactured by seamless process and both hot finished and cold finished are applicable.

boiler seamless steel pipe A210 A1 A179 A192

stainless steel boiler tube
Heat treatment:Hot finished tubes need not be heat treated.Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher

Steel grade SA192 Chemical Composition & Mechanical properties

Mn
P
S
Si
Tensile Strength
Yeild point
Elongation
0.06-0.18
0.27-0.63
0.035Max
0.035Max
0.25Max
min ksi[Mpa] 47[325] 
 min ksi[Mpa] 26[180]  
≥35%   

 

 

Hardness

 

Brinell Hardness
Rockwell Hardness Number
 WT≥0.200in(5.1mm)
 WT<0.200in(5.1mm)
137HRB
77HRB

boiler seamless steel pipe A210 A1 A179 A192

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness,                  Impact, Mictrostruture etc
8~ Packing and Stocking.

.jpg

.jpg

FAQ.jpg

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample of boiler seamless steel pipe A210 A1 A179 A192 for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us 

Contact Details
Haiyan Sanxin Steel Tube Co., Ltd.

Contact Person: group

Send your inquiry directly to us