Send Message
products
PRODUCTS DETAILS
Home > Products >
TORICH Professional supply galvanized mild seamless black carbon pipe

TORICH Professional supply galvanized mild seamless black carbon pipe

MOQ: negotiable
Price: negotiable
Detail Information
Place of Origin
Zhejiang, China (Mainland)
Certification
ISO9001, ISO14001, TS16949
Standard:
ASTM, BS, DIN, GB, JIS
Standard2:
ASTM A513-2007, BS 6323, BS EN10025, DIN EN 10305, GB/T 17396-1998, GB/T 3639-2000, GB/T 8713, JIS G3464-2006
Grade Group:
10#-45#, Q195-Q345, ST35-ST52
Grade:
20#, 45#, Q345, ST35, St35.8, St37, St37-2, St45, St52
Thickness:
5 - 60 Mm
Section Shape:
Round
Outer Diameter(Round):
50 - 500 Mm
Secondary Or Not:
Non-secondary
Application:
Structure Pipe
Technique:
Cold Drawn
Surface Treatment:
Other
Special Pipe:
Other
Alloy Or Not:
Non-alloy
Length:
3-12m
Keyword:
Black Carbon Pipe
Highlight:

carbon steel boiler tubes

,

industrial steel pipe

Product Description

.jpg

Professional supply galvanized mild seamless black carbon pipe

black carbon pipe

Standard : GB/T3639, GB/T8713, EN10305-1:2002, EN10305-2:2002,
ASTM A519-2006, ASTM A513-2007, GB/T1591-2008, GB/T17396-2009


Material: 20#, 45#, Q345B, Q345D, 25Mn, 27SiMn, E355

 

Type: Hydraulic Cylinder Tube

I.D.: 40-400mm

W.T.: ≥5mm

Length: Up To 12000mm According To Customer's Requirement

Surface Treatment: As Customer's Required
Place Of Origin: Zhejiang, China (Mainland)

 

HTB1F13dPXXXXXaJXpXX760XFXXXe.png

.jpg

PIC_20160924_152944_0DC.jpg
 
Detailed Images
.jpg

.jpg

.jpg

.jpg

.jpg

.jpg

.jpg

-1.jpg

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished MeasuringInspection
7~ Machanical Testing in own labs with Tensile Strength, YieldStrength, Elongation, Hardness,                 Impact, Mictrostruture etc
8~ Packing and Stocking.

.jpg

.jpg

FAQ.jpg

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer andsolution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is30-60 days if the goods are not in stock, it is according toquantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay thecost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us 

products
PRODUCTS DETAILS
TORICH Professional supply galvanized mild seamless black carbon pipe
MOQ: negotiable
Price: negotiable
Detail Information
Place of Origin
Zhejiang, China (Mainland)
Certification
ISO9001, ISO14001, TS16949
Standard:
ASTM, BS, DIN, GB, JIS
Standard2:
ASTM A513-2007, BS 6323, BS EN10025, DIN EN 10305, GB/T 17396-1998, GB/T 3639-2000, GB/T 8713, JIS G3464-2006
Grade Group:
10#-45#, Q195-Q345, ST35-ST52
Grade:
20#, 45#, Q345, ST35, St35.8, St37, St37-2, St45, St52
Thickness:
5 - 60 Mm
Section Shape:
Round
Outer Diameter(Round):
50 - 500 Mm
Secondary Or Not:
Non-secondary
Application:
Structure Pipe
Technique:
Cold Drawn
Surface Treatment:
Other
Special Pipe:
Other
Alloy Or Not:
Non-alloy
Length:
3-12m
Keyword:
Black Carbon Pipe
Minimum Order Quantity:
negotiable
Price:
negotiable
Highlight

carbon steel boiler tubes

,

industrial steel pipe

Product Description

.jpg

Professional supply galvanized mild seamless black carbon pipe

black carbon pipe

Standard : GB/T3639, GB/T8713, EN10305-1:2002, EN10305-2:2002,
ASTM A519-2006, ASTM A513-2007, GB/T1591-2008, GB/T17396-2009


Material: 20#, 45#, Q345B, Q345D, 25Mn, 27SiMn, E355

 

Type: Hydraulic Cylinder Tube

I.D.: 40-400mm

W.T.: ≥5mm

Length: Up To 12000mm According To Customer's Requirement

Surface Treatment: As Customer's Required
Place Of Origin: Zhejiang, China (Mainland)

 

HTB1F13dPXXXXXaJXpXX760XFXXXe.png

.jpg

PIC_20160924_152944_0DC.jpg
 
Detailed Images
.jpg

.jpg

.jpg

.jpg

.jpg

.jpg

.jpg

-1.jpg

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished MeasuringInspection
7~ Machanical Testing in own labs with Tensile Strength, YieldStrength, Elongation, Hardness,                 Impact, Mictrostruture etc
8~ Packing and Stocking.

.jpg

.jpg

FAQ.jpg

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer andsolution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is30-60 days if the goods are not in stock, it is according toquantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay thecost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us