logo
products
PRODUCTS DETAILS
Home > Products >
Carbon Steel Boiler And Superheater Tubes SA-210C 5-420mm

Carbon Steel Boiler And Superheater Tubes SA-210C 5-420mm

MOQ: 3Ton
Price: USD 1000-2000 Per Ton
Standard Packaging: as you request
Delivery Period: 5-8 Weeks
Payment Method: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Capacity: 6000 Tons Per Year
Detail Information
Place of Origin
Zhejiang China
Brand Name
TORICH
Certification
CE,ISO
Model Number
ASTM A210
Product Name:
SA-210C 5-420mm Carbon Steel Boiler And Superheater Tubes
Material:
Carbon
Alloy Or Not:
Non-alloy
Technique:
Hot Finished Or Cold Finished
Outer Diameter(round):
12.7-127 Mm
Thickness:
0.9-12.7mm
Length:
5-420mm
Usage:
Boiler, Superheater
Standard:
SA210
Grade:
C
Highlight:

Superheater Carbon Steel Tube

,

420mm Carbon Steel Tube

,

Carbon Steel Superheater Tubes

Product Description

SA-210C 5-420mm Carbon Steel Boiler and Superheater Tubes

 

SA-210C 5-420mm Carbon Steel Boiler and Superheater Tubes
Applications: for Boilers,Superheaters,Steam linepipes of boilers
Size range: O.D.:12.7-127mm W.T.:1-15mm L: according to customer requirement

Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes

 

Steel Grade and Chemical Compositions:
Grade C Mn P S Si
A-1 ≤0.27 ≤0.93 ≤0.035 ≤0.035 ≥0.10
C ≤0.35 0.29-1.06 ≤0.035 ≤0.035 ≥0.10


Mechanical properties:

Grade Yield Point
Mpa(ksi)
Tensile Strength
Mpa(ksi)
Elongation
A-1 ≥255(37) ≥415(60) ≥30%
C ≥275(40) ≥485(70) ≥30%

 

Tolerance for OD and WT(SA-450/SA-450M)
OD in(mm) + - WT in(mm) + -
<1''(25.4) 0.10 0.10 ≤1.1/2''(38.1) 20% 0
1''~1.1''(25.4~38.1) 0.15 0.15 >1.1/2''(38.2) 22% 0
>1.1/2''~<2''(38.1~50.8 0.20 0.20      
2''~<2.1/2''(50.8~63.5) 0.25 0.25      
2.1/2''~<3''(63.5~76.2) 0.30 0.30      
3''~<4''(76.2~101.6) 0.38 0.38      
4''~<7.1/2''(101.6~190.5) 0.38 0.64      
>7.1/2~9''(190.5~228.6) 0.38 1.14      

 

Surface Condition:

Pickling or shot blasting, Passivated, Black Phosphating.

 

Tests and Inspection:

Flattening Test

Flaring Test

Hardness Test

Hydrostatic or Nondestruction Electric Test ( Eddy Current and Ultrasonic Testing)

Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes

PRODUCT PICTURE

Carbon Steel Boiler And Superheater Tubes SA-210C 5-420mm 0t exchangestainless steel pipe

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

 

 

Carbon Steel Boiler And Superheater Tubes SA-210C 5-420mm 1

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample of Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

 

Keyword: Carbon Steel Boiler Tube , ASTM A210 Boiler Tube, Grade C Boiler Tube 

 

products
PRODUCTS DETAILS
Carbon Steel Boiler And Superheater Tubes SA-210C 5-420mm
MOQ: 3Ton
Price: USD 1000-2000 Per Ton
Standard Packaging: as you request
Delivery Period: 5-8 Weeks
Payment Method: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Capacity: 6000 Tons Per Year
Detail Information
Place of Origin
Zhejiang China
Brand Name
TORICH
Certification
CE,ISO
Model Number
ASTM A210
Product Name:
SA-210C 5-420mm Carbon Steel Boiler And Superheater Tubes
Material:
Carbon
Alloy Or Not:
Non-alloy
Technique:
Hot Finished Or Cold Finished
Outer Diameter(round):
12.7-127 Mm
Thickness:
0.9-12.7mm
Length:
5-420mm
Usage:
Boiler, Superheater
Standard:
SA210
Grade:
C
Minimum Order Quantity:
3Ton
Price:
USD 1000-2000 Per Ton
Packaging Details:
as you request
Delivery Time:
5-8 Weeks
Payment Terms:
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability:
6000 Tons Per Year
Highlight

Superheater Carbon Steel Tube

,

420mm Carbon Steel Tube

,

Carbon Steel Superheater Tubes

Product Description

SA-210C 5-420mm Carbon Steel Boiler and Superheater Tubes

 

SA-210C 5-420mm Carbon Steel Boiler and Superheater Tubes
Applications: for Boilers,Superheaters,Steam linepipes of boilers
Size range: O.D.:12.7-127mm W.T.:1-15mm L: according to customer requirement

Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes

 

Steel Grade and Chemical Compositions:
Grade C Mn P S Si
A-1 ≤0.27 ≤0.93 ≤0.035 ≤0.035 ≥0.10
C ≤0.35 0.29-1.06 ≤0.035 ≤0.035 ≥0.10


Mechanical properties:

Grade Yield Point
Mpa(ksi)
Tensile Strength
Mpa(ksi)
Elongation
A-1 ≥255(37) ≥415(60) ≥30%
C ≥275(40) ≥485(70) ≥30%

 

Tolerance for OD and WT(SA-450/SA-450M)
OD in(mm) + - WT in(mm) + -
<1''(25.4) 0.10 0.10 ≤1.1/2''(38.1) 20% 0
1''~1.1''(25.4~38.1) 0.15 0.15 >1.1/2''(38.2) 22% 0
>1.1/2''~<2''(38.1~50.8 0.20 0.20      
2''~<2.1/2''(50.8~63.5) 0.25 0.25      
2.1/2''~<3''(63.5~76.2) 0.30 0.30      
3''~<4''(76.2~101.6) 0.38 0.38      
4''~<7.1/2''(101.6~190.5) 0.38 0.64      
>7.1/2~9''(190.5~228.6) 0.38 1.14      

 

Surface Condition:

Pickling or shot blasting, Passivated, Black Phosphating.

 

Tests and Inspection:

Flattening Test

Flaring Test

Hardness Test

Hydrostatic or Nondestruction Electric Test ( Eddy Current and Ultrasonic Testing)

Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes

PRODUCT PICTURE

Carbon Steel Boiler And Superheater Tubes SA-210C 5-420mm 0t exchangestainless steel pipe

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

 

 

Carbon Steel Boiler And Superheater Tubes SA-210C 5-420mm 1

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample of Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

 

Keyword: Carbon Steel Boiler Tube , ASTM A210 Boiler Tube, Grade C Boiler Tube