| MOQ: | 1ton |
| Price: | Negotiable |
| Standard Packaging: | in bundles or in wooden box |
| Delivery Period: | 20-30days |
| Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Capacity: | 5000Tons per Year |
EN10305-2 Precision Steel Tube Cold Drawn Steel Pipe
Torich is a professional manufacturer and supplier of steel tubes with over 20 years experience.
| Production name | EN10305-2 Precision Steel Tube Cold Drawn Steel Pipe |
| Brand | TORICH |
| Place of Origin | ZHEJIANG, CHINA |
| Material | E215 E235 E355,10#, 20#, 45#, Q235, Q345, Q195, Q215, ST52.4, ST37.4 |
| OD | 25 - 80 mm |
| WT | 1 - 8 mm |
| Length | As customer's require |
| Technique | Cold Drawn |
| Application | Automotive |
| Keyword | Precision Steel Tube, Steel Pipe, Cold Drawn |
Delivery conditions:
| Designation | Symbol | Description |
| Cold drawn / hard | +C | No heat treatment after final cold drawing process |
| Cold drawn / soft | +LC | After the final heat treatment there is a suitable drawing pass |
| Cold drawn and stress relieved | +SR | After the final cold drawing process the tubes are annealed in a controlled atmosphere |
| Annealed | +A | After the final cold drawing process the tubes are annealed in a controlled atmosphere |
| Normalized | +N | After the final cold drawing operation the tubes are normalized in a controlled atmosphere |
Chemical composition:
| Steel grade | % by mass | |||||
| Steel name | Steel number | C max | Si max | Mn max | P max | S max |
| E155 | 1.0033 | 0.11 | 0.35 | 0.70 | 0.025 | 0.025 |
| E195 | 1.0034 | 0.15 | 0.35 | 0.70 | 0.025 | 0.025 |
| E235 | 1.0308 | 0.17 | 0.35 | 1.20 | 0.025 | 0.025 |
| E275 | 1.0225 | 0.21 | 0.35 | 1.40 | 0.025 | 0.025 |
| E355 | 1.0580 | 0.22 | 0.35 | 1.60 | 0.025 | 0.025 |
![]()
![]()
![]()
![]()
FAQ:
A: manufacturer,also can do trading.
A: Generally speaking,it is 10-15 days if the goods are in stock,or it is 20-30 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact with me.
| MOQ: | 1ton |
| Price: | Negotiable |
| Standard Packaging: | in bundles or in wooden box |
| Delivery Period: | 20-30days |
| Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Capacity: | 5000Tons per Year |
EN10305-2 Precision Steel Tube Cold Drawn Steel Pipe
Torich is a professional manufacturer and supplier of steel tubes with over 20 years experience.
| Production name | EN10305-2 Precision Steel Tube Cold Drawn Steel Pipe |
| Brand | TORICH |
| Place of Origin | ZHEJIANG, CHINA |
| Material | E215 E235 E355,10#, 20#, 45#, Q235, Q345, Q195, Q215, ST52.4, ST37.4 |
| OD | 25 - 80 mm |
| WT | 1 - 8 mm |
| Length | As customer's require |
| Technique | Cold Drawn |
| Application | Automotive |
| Keyword | Precision Steel Tube, Steel Pipe, Cold Drawn |
Delivery conditions:
| Designation | Symbol | Description |
| Cold drawn / hard | +C | No heat treatment after final cold drawing process |
| Cold drawn / soft | +LC | After the final heat treatment there is a suitable drawing pass |
| Cold drawn and stress relieved | +SR | After the final cold drawing process the tubes are annealed in a controlled atmosphere |
| Annealed | +A | After the final cold drawing process the tubes are annealed in a controlled atmosphere |
| Normalized | +N | After the final cold drawing operation the tubes are normalized in a controlled atmosphere |
Chemical composition:
| Steel grade | % by mass | |||||
| Steel name | Steel number | C max | Si max | Mn max | P max | S max |
| E155 | 1.0033 | 0.11 | 0.35 | 0.70 | 0.025 | 0.025 |
| E195 | 1.0034 | 0.15 | 0.35 | 0.70 | 0.025 | 0.025 |
| E235 | 1.0308 | 0.17 | 0.35 | 1.20 | 0.025 | 0.025 |
| E275 | 1.0225 | 0.21 | 0.35 | 1.40 | 0.025 | 0.025 |
| E355 | 1.0580 | 0.22 | 0.35 | 1.60 | 0.025 | 0.025 |
![]()
![]()
![]()
![]()
FAQ:
A: manufacturer,also can do trading.
A: Generally speaking,it is 10-15 days if the goods are in stock,or it is 20-30 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact with me.