Send Message
TORICH INTERNATIONAL LIMITED 86-574-88255925 admin@steel-tubes.com
TP317 Heat Exchanger Steel Tube , Stainless Steel U Tubes

TP317 Heat Exchanger Steel Tube , Stainless Steel U Tubes

  • Highlight

    finned copper tubing

    ,

    erw boiler tubes

  • Standard
    ASTM
  • Type
    Seamless, Seamless
  • Steel Grade
    400 Series
  • Application
    Heat Exchanger
  • Welding Line Type
    Seamless
  • Thickness
    0.5-12mm
  • Outer Diameter
    6-127mm
  • Product Name
    TP317 Heat Exchanger Stainless Steel U Tubes
  • Keywords
    TP 317 U Tubes
  • Model No
    ASTM A213
  • Place of Origin
    Zhejiang, China (Mainland)
  • Brand Name
    Torich
  • Certification
    ISO
  • Model Number
    TP317
  • Minimum Order Quantity
    negotiable
  • Price
    negotiable

TP317 Heat Exchanger Steel Tube , Stainless Steel U Tubes

 

TP317  Heat exchanger stainless steel U tubes 

 

OD:6-127mm
WT:0.5-12mm

Grade: TP 317 TP317L TP321
Keywords:Stainless steel U tubes
 

SA213 long steel tubes, make to U bend tubes for boilers and heat exchangers.
With strong wood structure box packing by containers loading and shipping.

Heater tubes U TUBES with Stainless, Alloy steel grade available, Carbon Steel grade is also available.

 

 

Chemical composition

 

Steel grade  C max Mn max P max S max Si Max Cr Ni  Mo N
TP317 0.08 2.00 0.045 0.03 1.00 18.00-20.00 11.00--15.00 3.00-4.00 -
TP317L 0.035 2.00 0.045 0.030 1.00 18.00-20.00 11.00-15.00 3.00-4.00 -
TP321 0.08 2.00 0.045 0.030 1.00 17.00-19.00 9.00-12.00 - -

TP321 Ti5(C+N)-0.70

Mechanical Properties:

 

Material

Mechanical Properties

Tensile Strength ≥ MPa

yield strength   ≥ MPa

Elongation ≥ %

TP317

515

205

35

TP317L

515

205

35

TP321

515

205

35

Acknowledge:

 

Gauge-Inch-mm Gauge 12 14 15 16

25cd313e63de6025dfa44d6aaf.jpg

.jpg

 

 2.jpg

 

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness,                  Impact, Mictrostruture etc
8~ Packing and Stocking.

 

 

FAQ.jpg

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample of TP317  Heat exchanger stainless steel U tubes  for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us