MOQ: | negotiable |
Price: | negotiable |
ASTM A210 Seamless Medium Carbon Steel Boiler And Superheater Tubes
ASTM A210 Seamless medium carbon steel boiler and superheater tubes
Applications: for Boilers,Superheaters,Steam linepipes of boilers
Size range: O.D.:12.7-127mm W.T.:1-15mm L: according to customer requirement
Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes
Steel Grade and Chemical Compositions: | |||||
Grade | C | Mn | P | S | Si |
A-1 | ≤0.27 | ≤0.93 | ≤0.035 | ≤0.035 | ≥0.10 |
C | ≤0.35 | 0.29-1.06 | ≤0.035 | ≤0.035 | ≥0.10 |
Mechanical properties:
Grade | Yield Point Mpa(ksi) | Tensile Strength Mpa(ksi) | Elongation |
A-1 | ≥255(37) | ≥415(60) | ≥30% |
C | ≥275(40) | ≥485(70) | ≥30% |
Tolerance for OD and WT(SA-450/SA-450M) | |||||
OD in(mm) | + | - | WT in(mm) | + | - |
<1''(25.4) | 0.10 | 0.10 | ≤1.1/2''(38.1) | 20% | 0 |
1''~1.1''(25.4~38.1) | 0.15 | 0.15 | >1.1/2''(38.2) | 22% | 0 |
>1.1/2''~<2''(38.1~50.8 | 0.20 | 0.20 | |||
2''~<2.1/2''(50.8~63.5) | 0.25 | 0.25 | |||
2.1/2''~<3''(63.5~76.2) | 0.30 | 0.30 | |||
3''~<4''(76.2~101.6) | 0.38 | 0.38 | |||
4''~<7.1/2''(101.6~190.5) | 0.38 | 0.64 | |||
>7.1/2~9''(190.5~228.6) | 0.38 | 1.14 |
Surface Condition:
Pickling or shot blasting, Passivated, Black Phosphating.
Tests and Inspection:
Flattening Test
Flaring Test
Hardness Test
Hydrostatic or Nondestruction Electric Test ( Eddy Current and Ultrasonic Testing)
Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes
heat exchangestainless steel pipe
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample of Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
MOQ: | negotiable |
Price: | negotiable |
ASTM A210 Seamless Medium Carbon Steel Boiler And Superheater Tubes
ASTM A210 Seamless medium carbon steel boiler and superheater tubes
Applications: for Boilers,Superheaters,Steam linepipes of boilers
Size range: O.D.:12.7-127mm W.T.:1-15mm L: according to customer requirement
Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes
Steel Grade and Chemical Compositions: | |||||
Grade | C | Mn | P | S | Si |
A-1 | ≤0.27 | ≤0.93 | ≤0.035 | ≤0.035 | ≥0.10 |
C | ≤0.35 | 0.29-1.06 | ≤0.035 | ≤0.035 | ≥0.10 |
Mechanical properties:
Grade | Yield Point Mpa(ksi) | Tensile Strength Mpa(ksi) | Elongation |
A-1 | ≥255(37) | ≥415(60) | ≥30% |
C | ≥275(40) | ≥485(70) | ≥30% |
Tolerance for OD and WT(SA-450/SA-450M) | |||||
OD in(mm) | + | - | WT in(mm) | + | - |
<1''(25.4) | 0.10 | 0.10 | ≤1.1/2''(38.1) | 20% | 0 |
1''~1.1''(25.4~38.1) | 0.15 | 0.15 | >1.1/2''(38.2) | 22% | 0 |
>1.1/2''~<2''(38.1~50.8 | 0.20 | 0.20 | |||
2''~<2.1/2''(50.8~63.5) | 0.25 | 0.25 | |||
2.1/2''~<3''(63.5~76.2) | 0.30 | 0.30 | |||
3''~<4''(76.2~101.6) | 0.38 | 0.38 | |||
4''~<7.1/2''(101.6~190.5) | 0.38 | 0.64 | |||
>7.1/2~9''(190.5~228.6) | 0.38 | 1.14 |
Surface Condition:
Pickling or shot blasting, Passivated, Black Phosphating.
Tests and Inspection:
Flattening Test
Flaring Test
Hardness Test
Hydrostatic or Nondestruction Electric Test ( Eddy Current and Ultrasonic Testing)
Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes
heat exchangestainless steel pipe
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample of Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us